In July I was able to arrange a way to haul home the mast for my boat. Once home, I removed all the old rigging items and have it stored in the shop, ready for the eventual refinishing of the mast (still up in the air on how I will re-finish - clear coat or paint).
I have removed all the teak trim that surrounded the cockpit, I plan on just refinishing the fiberglass.
I was also able to salvage some old growth fir floor planking - I have milled it down and will be using this for the interior fit out along with the cockpit seating.
![]() |
One of the spar brackets is broken (still have the spar), so will need to have some aluminum welding done. |
No Tiller handle came with my boat - time to make one |
Completed raw tiller handle (laminated white oak and mahogany planking from my boat that I will not use) |